Integrated Change Control

Integration Management – The Basics

https://youtu.be/WSg8z8m7IeU If you don't already know, the key role of the Project Manager is to perform integration. Bring everything together.…

How to deal with Change Requests?

https://www.youtube.com/watch?v=1fVIel3lbrA There are 4 steps to be taken when dealing with Change Requests as a Project Manager, 1. Evaluate the…

Examples of Preventive Actions and Corrective Actions

https://www.youtube.com/watch?v=CH5J3e0K528 RELATED LINKS CHANGE MANAGEMENT PLAYLIST https://www.youtube.com/watch?v=2L5ap1VKNMY&list=PLLRADeJk4TCJTUJ44lVTSxuHXBgW70EHA INTEGRATION MANAGEMENT https://www.youtube.com/watch?v=Erd8OlmXiFg&list=PLLRADeJk4TCLCkrwbpg3C7l0LsYzZPwZH INTEGRATION MANAGEMENT FAQs https://www.youtube.com/watch?v=Y3pBqorQW5A&list=PLLRADeJk4TCLrX6lXJhyrLqtgw-iUCl31 SHOP FOR PMP AT AMAZON INDIA…

Does every change require CCB Approval?

https://www.youtube.com/watch?v=dnA3OAVLysg From a large scope altering change that may have a significant impact on the schedule and costs of the…

Who Approves Changes?

https://www.youtube.com/watch?v=XujpGFyzPvw Fine, we have changes! Can't I approve them myself? Afterall, I am the Project Manager. Let's look into who…

Change Request (CR) and Change Control Board (CCB)

https://www.youtube.com/watch?v=xHThvMe8dC4 We have already discussed the Perform Integrated Change Control process and concluded that changes are inevitable. No matter how great the…

Overview of the Perform Integrated Change Control Process

https://www.youtube.com/watch?v=2L5ap1VKNMY In addition to the Monitor and Control Project Work process, the other process under Integration Management knowledge area and…

Top 3 things to know about Monitor and Control Project Work Process

https://www.youtube.com/watch?v=4ddL604_m1s Monitoring and Controlling process as a whole oversees all the tasks and metrics necessary to ensure that the approved…