We have seen how Fast-Tracking and Crashing work as Schedule Compression Techniques. Since most of the projects, most of the time run behind schedule, why can’t we simply use these techniques on all projects by default?
Don’t miss the Lounge Fever video above for an answer to this question.
RELATED LINKS
SCHEDULE MANAGEMENT
https://goo.gl/sKpxmP
SCHEDULE MANAGEMENT: FAQs
https://goo.gl/F7iwHn
ALL ABOUT CRITICAL PATH METHOD (CPM)
https://goo.gl/S6RKCB
VLOGS – LOUNGING AROUND
https://goo.gl/3p7bbe